Stan the Standby, the Generator Envy mascotGenerator Envy™
Solar structures

A backyard building that makes its own power

Heavy posts and beams with solar panels for the roof. It charges the car, helps run the hot tub and keeps the essentials on in an outage, with no hookup to the power company.

Illustration of a post and beam pavilion with a solar panel roof over a hot tub on a stone patio at dusk, an upscale home behind
Illustration

See what’s in the price

Six fixed plans, each with a target price

One set of parts, six buildings

We build six fixed plans and nothing custom. Every one uses the same solar panel, the same rough sawn, pressure-treated 8x8 posts, the same paired 4x10 beams bolted through the posts, and the same bay, three panels wide. A longer plan is the same building with one more bay.

That is how we can put a price on each one. The timber list, the wiring and the engineer’s drawings are worked out once for each plan, not once for each customer. Every plan carries the same 12 kW inverter and two batteries, about 10 kWh. That is more than the smallest plan needs, and it keeps one wiring layout across all six.

PlanRoofSolar roofAverage dayTarget price
Hot Tub PergolaOne slope, 11 x 11 ft6 panels, 2.6 kWabout 10 kWh$22,500
Patio PergolaOne slope, 23 x 11 ft12 panels, 5.3 kWabout 20 kWh$28,500
Poolside PergolaOne slope, 34 x 11 ft18 panels, 7.9 kWabout 30 kWh$35,000
One-Car CarportGable, 11 x 22 ft12 panels, 5.3 kWabout 18 kWh$27,500
PavilionGable, 23 x 22 ft24 panels, 10.6 kWabout 35 kWh$38,000
Two-Car CarportGable, 23 x 22 ft24 panels, 10.6 kWabout 35 kWh$38,000
Illustration of the Hot Tub Pergola
Hot Tub Pergola, $22,500. Illustration.
Illustration of the Patio Pergola
Patio Pergola, $28,500. Illustration.
Illustration of the Poolside Pergola
Poolside Pergola, $35,000. Illustration.
Illustration of the One-Car Carport
One-Car Carport, $27,500. Illustration.
Illustration of the Pavilion
Pavilion, $38,000. Illustration.
Illustration of the Two-Car Carport
Two-Car Carport, $38,000. Illustration.

Target prices are built and wired in eastern North Carolina, with the footings, the engineer’s stamp and the permits in the price. The carport is budgeted line by line below. The four smaller plans are priced from the same lines, and the first build of each will settle its number. The floor under it, pavers or a slab, is not in the price. Average-day power is a PVWatts estimate for Charlotte.

See all six in 3D

Illustration of a two-car post and beam carport with a solar panel roof on a paver driveway, a Rivian charging under it and a hot tub behind
Illustration

The carport

Target price $38,000
  • Two cars, 22.5 ft wide by about 22.7 ft deep, on six posts
  • 24 solar panels for the roof, 10.6 kW
  • About 35 kWh a day, averaged over the year in North Carolina, roughly 100 miles of driving
  • A car charger on the back post
  • Two batteries, about 10 kWh, in a cabinet at standing height
Illustration of a hot tub set into a stone patio under a post and beam solar pavilion beside a pool at dusk
Illustration

The pavilion

Target price $38,000
  • The same frame as the carport: a gable roof 22.7 ft long by 22.3 ft across, on six posts
  • 24 solar panels for the roof, 10.6 kW
  • About 35 kWh a day, averaged over the year in North Carolina
  • Room for a hot tub under the roof, or set it beside the pool
  • Two batteries, about 10 kWh, in a cabinet at standing height
How it is built

Post and beam, bolted

  • Rough sawn, pressure-treated 8 by 8 posts, a full 8 inches each way, on raised steel bases and concrete footings, so the wood never sits in water.
  • Each beam is a pair of 4 by 10 timbers, one on each side of the posts, with four bolts through all three. Straight braces, bolted on. No notches, no pegs, no fancy joinery.
  • Rafters spaced so every panel seam lands on a timber.
  • The panels are the only roof. A gasket in each seam, a drip channel on each rafter and a gutter on the low side keep it dry underneath.
  • The wiring runs inside one post. The inverter and batteries sit in a cabinet clad in the same timber.
  • GeneratorEnvy.com is burned into a post on every one.
Illustration of a branding iron pulled back from the fresh GeneratorEnvy.com brand on a rough sawn 8 by 8 post
Illustration
What it runs

From day one, and later

From the first dayWith a cord or buried cable to the house
The car. A hot tub. A pool pump. Lights, fans and outlets under the roof.The refrigerator, freezer, well pump, furnace and lights in the house, through the same kind of inlet a portable generator uses.

It never sends power to the grid, so there is no net metering, no interconnection agreement and no waiting on the power company. The inlet at the house still gets an electrical permit and an inspection, like any generator hookup.

About 10 kWh of battery carries a refrigerator, the fan on a gas furnace, the internet and some lights through a night. It is not whole-house backup. On a gray week, a small generator or a plug-in charger tops up the batteries.

The whole price

What is in the price

Every line of the carport, the way we budgeted it. The lines come to $36,530, and the $38,000 target holds $1,470 in reserve for whatever the first build turns up. The pavilion is the same frame with a hot tub circuit in place of the car charger, and carries the same $38,000 target. The engineer’s stamp and the permit fees are in the price.

The carportBudget
24 solar panels$3,600
Seam gasket, drip channels and gutter$2,000
Timber and hardware$8,000
Footings$2,800
Inverter and two batteries$3,880
Wiring, cabinet and outlets$2,000
Car charger$450
Labor, craftsman and electrician$11,500
Engineer’s stamp and permits$2,300
Total$36,530

Panels, inverter, batteries and charger are listed prices. Timber, footings, labor and engineering are our estimates until a craftsman prices the first one. These numbers assume inland wind; a coastal build needs the engineer’s numbers first.

Not in the price: the hot tub itself, a generator, the cord or buried cable to the house, unusual site work, and anything your HOA asks for.

Who does what

The craftsman, the electrician and you

CraftsmanLicensed electricianYou
Footings, the frame, the panel roof and the cabinetConnects the panels, inverter and batteries, the outlets, the car charger and the inlet to the houseChoose the spot, hire the electrician, and plug things in

In North Carolina a job under $40,000 does not need a general contractor license, and both buildings are priced to stay under it. The job needs a building permit and an electrical permit from your county. Approval depends on your county, setbacks, flood zone and HOA, so we look at those before anyone pours a footing.

Where things stand: both designs are drawn and priced line by line. None has been built yet; the first ones are planned for eastern North Carolina.

Is it for you?

Who it is not for

It is for someone who wants a handsome building in the yard that also makes its own power, quietly, and keeps the essentials going when the lines go down.

Questions

Straight answers

How it fits with the names you know

A solar structure is one piece of a backup plan. Here is how it sits next to the equipment people already ask about.

Questions people ask

Why under $40,000?

In North Carolina a job under $40,000 does not need a general contractor license. Both buildings are priced to stay under that line, so a skilled local craftsman can build them.

Does it hook up to the power company?

No. It runs on its own from the first day, so there is no application to the power company and no waiting on them. If you want it to help run the house, a cord or a buried cable goes to the same kind of inlet a portable generator uses.

What happens on a run of gray days?

The batteries carry the evening and the night. For a gray week, a small generator or a plug-in charger tops them up.

Are these prices final?

No. The panels, inverter, batteries and charger are listed prices. The timber, footings, labor and engineering are our estimates until a craftsman prices the first one. A coastal build needs the engineer’s wind numbers first.

Can I add a fireplace?

Yes, later, by hiring a mason yourself. With a fireplace built in from the start, the job goes over $40,000 and needs a licensed general contractor.

Keep reading

Have a question we did not answer? Write to stan@generatorenvy.com. Stan grumbles, but a real person answers.