Stan the Standby, the Generator Envy mascotGenerator Envy™
For electricians and builders

One-line diagrams

Four stages, from a stand-alone roof to a grid tie. The concept is the same for the carport and the pool house; the permit drawings are not. These are concept diagrams; your one-line for the permit is your own.

Home / Pros / Wiring
For electricians and builders

Pick the system at Stage 1

The stages only build on each other if the first battery and inverter belong to one maker’s system that supports every later step. Mixing makers is where upgrades turn into tear-outs. Before Stage 1, confirm in the manufacturers’ own installation documents that the chosen equipment can:

If any answer is no or unknown, plan for that part to be replaced at the later stage and say so in the quote.

Stage 1: Stand alone

The roof and a battery run the structure’s own loads: pump, salt chlorine generator, lights, fans, fridge, outlets. No connection to the house or the utility, so no interconnection approval. Building and electrical permits still apply. Code: NEC Article 710 (stand-alone systems) along with 690 and 706. The inverter, battery, solar and any generator or controls the maker requires must form a complete, maker-supported stand-alone system. If the owner wants it generator-free, find equipment the maker supports that way, and check that it also supports the later stages.

Solar roofmicroinverter per panelAC trunkAC disconnectat the postBattery + invertergrid-forming, listedPool houseloads panelStand-alone: no connection to the house panel or the utility.

Stage 2: Back up the house

A feeder from the battery to a transfer switch or backup panel at the house. When the grid drops, the switch isolates the house from the utility and the battery carries the chosen circuits. In a supported multimode system, the battery inverter forms the AC the microinverters need, so solar keeps refilling the battery during the outage. Test that in commissioning with the grid actually off.

Solar roofmicroinverter per panelAC disconnectat the postBattery + invertergrid-forming, listedPool houseloads panelfeeder, underground conduitTransfer switchor backup panelHouse backuploads (chosen circuits)House mainpanelUtility meterGreen = added. The switch isolates the house from the utility before the battery carries it. No export to the grid.

Stage 3: Add the vehicle

A charger on the post charges the vehicle from the roof. Sending power back to the house takes a transfer arrangement approved for that vehicle: the maker’s own kit, or a third-party system the maker expressly supports, like Ford’s GenerLink option. Never a generic interlock, cord or transfer switch without documented suitability.

Solar roofmicroinverter per panelAC disconnectat the postBattery + invertergrid-forming, listedPool houseloads panelfeeder, underground conduitTransfer switchor backup panelHouse backuploads (chosen circuits)House mainpanelUtility meterEV charger / maker’slisted V2H kitVehicletwo-way if supportedCharging only: any listed charger. Sending power back: only equipment approved for that vehicle, never a generic transfer switch.
VehicleHome backup equipmentOutput
GM EVs (Silverado EV, Sierra EV, Hummer EV, Equinox EV and others)GM Energy V2H Bundle: the PowerShift bidirectional charger plus the V2H Enablement Kit (Home Hub, inverter and a dark-start battery that boots the system in an outage). List price $8,998. Check GM’s list of V2H-capable models, years and trims. GM says this equipment doesn’t work with other makers’ battery systems.Up to 9.6 kW
Tesla CybertruckTwo separate setups. Without a Powerwall: Universal Wall Connector, Powershare Gateway and, where needed, a Backup Switch. With a Powerwall 3: the Powerwall and a Gen 3 or Universal Wall Connector. Never put a Powershare Gateway into a Powerwall system. The truck’s 9.6 kW bed outlets are a different thing.Up to 11.5 kW
Tesla Model 3 / Model YPowerwall 3 and a Gen 3 or Universal Wall Connector (no Gateway option). Only cars with the hardware: U.S. orders from Oct 1, 2026 and some earlier builds; check the car shows “Powershare Support: Enabled” (software 2026.32.6 or later). Tesla’s current eligibility instructions offer no retrofit; check the individual car before you quote. Powerwall 2 and Powerwall+ support is listed as coming later.Up to 11.5 kW
Ford F-150 PowerBoost and LightningGenerLink transfer switch at the meter (or beside it where the utility allows other switch types), a GenerLok cord and Ford’s 12-inch vehicle connector to the 240-volt Pro Power Onboard outlet. Fits 2021–2026 PowerBoost (7.2 kW) and 2022–2025 Lightning (9.6 kW). About $1,100 for the bundle; installation about $250–$450 at the meter or $1,000–$1,500 beside it. How the GenerLink hookup works. The utility must approve it and decides who installs. The PowerBoost runs its gas engine to keep up: outdoors only, never in a garage or under an enclosed roof.7.2 kW for either truck through this hookup: one 240-volt, 30-amp outlet. The Lightning’s 9.6 kW is the total across all its outlets.

These are separate systems, not plug-in Stage 3 modules. Each may bring its own transfer equipment and energy management, and its fit with the Stage 1 battery and solar has to be documented for the exact combination. Status as each maker has announced it. Full vehicle list.

Stage 4: Tie to the grid

With the utility’s approval, the system interconnects to the house and starts lowering the bill. In an outage the battery inverter disconnects from the grid and keeps the backup loads running. Plain grid-tied solar without that kind of battery shuts off.

Solar roofmicroinverter per panelAC disconnectat the postBattery + invertergrid-forming, listedPool houseloads panelfeeder, underground conduitTransfer switchor backup panelHouse backuploads (chosen circuits)House mainpanelUtility meterutility-approved interconnectionDashed = grid tie, after the utility approves it. The battery inverter disconnects from the grid in an outage and keeps the backup loads running.

Generator Envy provides the structure and the stamped structural drawings. Wire sizes, breakers, branch circuits, the point of connection and all electrical work are designed and installed by a licensed electrician under a local permit. Code notes here are pointers to check, not legal or engineering advice; your inspector has the final say.