Two-truck carport spec sheet

The numbers and the wiring route for the 20 x 24 foot timber frame carport. Final dimensions and panel count come from the stamped set for the site.

Home / Pros / Carport
For electricians and builders

The structure

FootprintAbout 20 x 24 feet, two full-size trucks side by side
Frame8 x 8 posts, 8 x 10 beams, 4 x 6 knee braces, 4 x 8 rafters under every panel seam, black steel plates
FootingsConcrete piers; size, depth and reinforcing by the engineer of record
HeadroomSet to the owner’s vehicles on the stamped set; measure under the lowest knee brace
RoofGable, 5 in 12 (about 22.6°). The glass panels are the roof surface, as part of the engineered roof assembly on the stamped set: module model, attachment, seals and drainage, fire classification, wind uplift and how a broken panel gets replaced. A module’s listing alone doesn’t make it a roof.
SolarAbout 7.5 kW of bifacial glass panels (about 13 at 580 W); exact count on the stamped set
Expected outputAbout 25 kWh a day averaged over the year in Charlotte (NREL PVWatts, both roof slopes): about 13 in December, about 35 in June. Month by month

The wiring route

  1. Microinverters, one per panel, on top of the ridge beam. Panel leads plug in right above.
  2. AC trunk cable along the ridge top to the end, then down the top of the end rafter.
  3. Along the plate top, under the panels and behind the rafter tails.
  4. Junction box on the plate top beside the rafter over the chase post. Wet-location listed and gasketed. Out of sight under the panels but reachable by lifting the panel above it, as NEC 314.29 requires; leave the clamp access to do that.
  5. Down a 1-1/4" hole through the plate into the routed chase in the post. 3/4" liquidtight in the back of the groove; a flush cover strip closes it. No splices or pull points inside the chase. The cover is set back far enough, or the raceway protected, so trim nails and screws can’t reach it (NEC 300.4). The engineer of record approves the plate hole and the routed post.
  6. Out the bottom of the post into the Schedule 80 PVC sweep and stub cast in the footing, then underground to the house panel or the backup battery.

From the ground you see only the plate, the rafter tails and the fascia. The steel brackets are not the grounding path.

Grounding and bonding

Point of connection

Yours to design. The one-line diagrams show the four ways it usually goes: stand-alone, house backup through a transfer switch, adding a two-way vehicle, and tying to the grid.

Code sections to check

Code basis in North Carolina: the state electrical code is the 2020 NEC with NC amendments, but one- and two-family dwellings are excluded from it and stay on the 2017 NEC with NC amendments. The 2023 code is adopted but on indefinite delay. Section numbers here are 2017 NEC unless marked. Confirm the edition with your inspector.

Generator Envy provides the structure and the stamped structural drawings. Wire sizes, breakers, branch circuits, the point of connection and all electrical work are designed and installed by a licensed electrician under a local permit. Code notes here are pointers to check, not legal or engineering advice; your inspector has the final say.